Rail Logix Industrial Park
Turn-key Design and Construction of an 800 Railcar Storage Yard for National Properties including:
- Earthwork construction
- Storm water systems installation
- Site lighting installation
- Soil stabilization
- Sub-ballast installation
- Tail track
- Inbound track
- Outbound track
- Large transload road
Installed 52,000 track feet of rail with no lost time accidents!