RAILROAD PROJECTS



RAILROAD PROJECTS


Railroad Projects


10,000 Railcar Storage

CMC - Sjolander SIT

CMC - Sjolander SIT

10,000 Railcar Storage












AmeriPort Baytown

AmeriPort Baytown

AmeriPort Baytown

2,500 Railcar Storage


Ameri-Port Baytown Industrial Park

Engineering oversight and construction of a 700 acre sight railcar storage yard for National Properties Holding including:

  • 700 Acre site
  • Earthwork construction
  • Storm water systems installation
  • Two entrance roads
  • Two unloading yards
  • One storage yard
  • Tail track Inbound track
  • Outbound track Parking lots
  • Detention ponds Installed over 150,000 track-feet of rail with no lost time accidents!
















BNSF Railroad Spur

BNSF Railroad Spur

BNSF Railroad Spur

BNSF Railroad Spur


Connection Track to N.R.G. Lead in Arcola, Texas- Constructed two railroad bridges

  • Performed wetland mitigation
  • Site-Preparation
  • Soil stabilization
  • Storm water system installation
  • Sub-ballast
  • New rail installation








Braskem - Deer Park Terminal

Braskem - Deer Park Terminal

Braskem - Deer Park Terminal

Braskem-LaPorte, TX

300 Railcar Storage Yard in Laporte, Texas including:

  • Earthwork construction
  • Storm water system installation
  • Yard lighting installation
  • Sub-grade lime stabilization
  • Sub-ballast installation
  • 20,000 track feet of rail
  • 20 turn-outs
  • 3 leads

46,000 W.T. Byler Co. man-hours without injury or incident!









Cameron - County Olmito Rail Yard Expansion and West Rail Project

Cameron - County Olmito Rail Yard Expansion and West Rail Project

Cameron - County Olmito Rail Yard Expansion and West Rail Project

Border Railroads


WT Byler Co Wins Contract for Construction of Olmito Railyard and Westrail Project - Brownsville

INTERNATIONAL RAILROAD - Coordination success for TxDOT, Cameron County, City of Brownsville, UPRR, KCSM, City of Matamoros, State of Tamaulipas, Secretaria de Comunicaciones y Transportes and multiple federal / state agencies. Over the past 20+ years, residents of the City of Brownville have wanted the railro ads out of downtown... deactivation to date is 79 of their 93 railroad crossings.

WT Byler Co wins contract with Cameron County for construction of the Olmito Railyard Expansion Project - $10.2M. McCarthy Building Companies wins W est Railroad Relocation Project - $26.5M, subcontracting the earthwork portion / new rail construction to W T Byler Co - $15.1M. The project will begin at the UPRR's junction to the Port of Brownsville and south of Olmito and then continue west and south for 5.8 miles crossing over US 281, the International Boundary and W ater Commission levee and continue across the Rio Grande River. The proposed international rail bridge is 15 river miles upstream from the existing B&M Bridge and the KCSM connection in Matamoros.







DOW Seadrift Industrial Spur

DOW Seadrift Industrial Spur

DOW Seadrift Industrial Spur

DOW Seadrift Industrial Spur


Burlington Northern Santa Fe Railroad Port Lavaca, Texas

  • Build in construction 8.7 miles and separate Wye Track
  • Excavate & embank 1.3 million CY of earth material
  • Mitigated 22.6 acres of wetlands
  • Excavated 50 acres of USDA catfish ponds
  • Excavated 5 cattle ponds
  • Constructed 800 LF of railroad bridges
  • Constructed 3 state highway overpasses
  • Constructed multiple county and private crossings
  • Installed 11 each E-80 loading crossings
  • Constructed 10’ x 10’ x 5-barrel culvert runs

Substantial completion with difficult milestones in 11.5 months – two weeks ahead of schedule within owners budget including value engineering. 225,000 man-hours with no lost time injuries!



Lehigh Hanson Crosby Terminal

Lehigh Hanson Crosby Terminal

Lehigh Hanson Crosby Terminal



Rail Logix - Alamo Junction

Rail Logix - Alamo Junction

Rail Logix - Alamo Junction

1,500 Acre Rail Park


Rail Logix Alamo Junction

  • Engineering Oversight / GC
  • Excavated and embanked over 2,000,000 CY of earth material
  • Imported and placed to line and grade over 200,000 tons of crushed stone
  • Constructed 47,000 track feet of of new rail including 4-interchange, 1 loop and 5 yard tracks with lead
  • Home to Baker Hughes, Weatherford International, Halliburton, etc.

Rail Logix Alamo Junction is strategically located southeast of San Antonio, Texas near the heart of the Eagle Ford Shale. This 520-acre rail park has the ability to accommodate both manifest and unit train traffic.









Rail Logix - Port Crossing

Rail Logix - Port Crossing

Rail Logix - Port Crossing

800 Railcar Storage


Rail Logix Industrial Park

Design Oversight and Turnkey Construction of an 800 Railcar Storage Yard for National Properties Holding including:

  • Earthwork construction
  • Storm water systems installation
  • Site lighting installation
  • Soil stabilization
  • Sub-ballast installation
  • Tail track
  • Inbound track
  • Outbound track
  • Large transload road

Installed 52,000 track feet of rail with no lost time accidents!



Sunoco - Nederland Unit Train

Sunoco - Nederland Unit Train

Sunoco - Nederland Unit Train

Sunoco Logistics Nederland Terminal


Design Over-site and Construction of a 120 Car Unit-Train Facility in Nederland, Texas on a 167 Acre site including:

  • Build in place 18,000 Track-feet of storage, lead & loop-track
  • Sitework completed for an additional 10,000 track-feet of loop-track
  • Large detention with associated pipe & ditch collector-system
  • Subcontracted 5,665 LF of sound-wall & 3 miles of new chain link/barbed wire fence system including remote access for both rail and trucks

EPC – Record breaking 6-month duration including design with Zero- Incidents











Texas Deep Water Terminal

Texas Deep Water Terminal

Texas Deep Water Terminal



Union Pacific - Livonia

Union Pacific - Livonia

Union Pacific - Livonia



Union Pacific - Spofford

Union Pacific - Spofford

Union Pacific - Spofford

475 Acre UP Railroad


Boxcar Cleaning Facility

Performed turnkey construction of a 475 acres facility in Spofford, Texas including:

  • Site clearing and grubbing
  • Excavated and embanked 2,000,000 CY of earth materials including 4 large detention ponds
  • On-sites included fresh-water system, raw sewage and industrial waste water treatment plants, complete electrical system and yard-air building with field-line system.
  • Build-in-construction 2 miles of chip seal entrance road
  • Build-in-construction 4 miles of asphalt roads at cleaning track
  • Build-in-construction 4 miles of French drains along cleaning track
  • Constructed 2 parking lots
  • Constructed 1 Loading dock
  • Constructed 1 maintenance/storage building - 4,000 SF
  • Constructed 50' x 650' repair canopy w/ compressors, welding/cutting lines and electrical
  • Constructed 4 lay down yards
  • Constructed 3 office buildings - 7000 SF
  • Constructed gas and diesel fueling depot 
  • Turnkey railroad system including 19 Turnouts and 58,384 TF














VA Lead

VA Lead

VA Lead



Vulcan Hockley

Vulcan Hockley

Vulcan Hockley



UP Railroad | Toyota Plant

UP Railroad | Toyota Plant

UP Railroad | Toyota Plant

UP Railroad | Toyota Plant

Union Pacific Railroad lead and bridge crossing Leon Creek - San Antonio, Texas

  • Cleared & grubbed over 700 acres of land
  • Wye track
  • Lead track
  • Large 500 TPG bridge
  • Laid base and asphalt for the plant

TMMTX manufactures the Tundra full-size pickup







UP Derailment

UP Derailment

UP Derailment